Home - Part 21 Subpart J and F Acoount

Ameen Design Organization

Ensuring your company meets regulatory requirements and customer expectations.

CAA IRI part 21 design organization, approved to design and certify various major and minor modifications through our comprehensive scope of work for large airplanes. Ameen customized solutions are developed on a case-by-case basis, flexibly and efficiently, to satisfy client expectations while meeting regulatory requirements.

AMEEN DOA(Design Organisation Approval)

A Design Organisation Approval is the recognition that a Design Organisation complies with the requirements of Part 21 Subpart J. The approval includes terms of approval defining:Scope of approval: The type of design activities including fields of expertise Categories of products: The applicable products such as Large Aeroplanes, Engines, Small Rotorcraft, Sailplanes, etc.
List of products: The list of products for which the DOA holder is Type Certificate applicant or holder (if applicable)
Privileges: A DOA holder can Perform design activities within the scope of approval Have compliance documents accepted by the Agency without further verification Perform activities independently from the Agency Limitations: Any limitations on the above.

 AMEEN'S DESIGN ORGANIZATION SCOPE OF WORK

Structure

  • ADS-B DO-260B Modification
  • FMS 2 Modification
  • Ceiling & Side Wall LED Light Installation
  • Mode S-Related Modifications
  • Micro QAR Modifications
  • Oxygen Container Replacement
  • Galley Equipment Installations
  • CVR Modifications
  • Antenna & Transceiver Modifications
  • ELT Installations

cabin

  • New Seats Installation / LOPA Change
  • IFE, PSU, Galley, Lavatory, Closet & Stowage, Carpet & NTF, Curtain, Placard & Emergency Equipment Removal / Installation
  • Floor Panel / Ceiling Panel / Sidewall Panels Modifications

avionics

  • ADS-B DO-260B Modification
  • FMS 2 Modification
  • Ceiling & Side Wall LED Light Installation
  • Mode S-Related Modifications
  • Micro QAR Modifications
  • Oxygen Container Replacement
  • EFB Mounting Provisions Installations
  • Galley Equipment Installations
  • CVR Modifications
  • Antenna and Transceiver Modifications

Get in touch with us!

Share your needs/problems with our experts and we will give you the solution as fast as possible.

 Upload a File
FileExample.pdf

Max File Size: 10 MB

Thank you! Your message has been sent.
Unable to send your message. Please fix errors then try again.